The Pre-Production Checklist (From Greenlight to Day One)

Everything that has to happen between "we're making this" and "rolling on day one," organized week by week so nothing falls through the cracks.

pre-productionchecklistworkflow
The Pre-Production Checklist (From Greenlight to Day One)

The Pre-Production Checklist (From Greenlight to Day One)

Pre-production is the period where a movie stops being an idea and starts being a plan you can actually execute. The work is invisible on screen but it's the difference between a shoot that runs on rails and one that burns its contingency by day three. There's no universal length — a weekend short might compress this into ten days, a studio feature stretches it over months — but the order of operations barely changes.

Below is the checklist organized by phase rather than fixed dates, because a two-week indie feature and a twelve-week studio picture both move through the same stages, just at different speeds.

Phase 1: Script lock and breakdown

Nothing downstream is reliable until the script is locked, or at least locked enough to breakdown against.

  • Final script draft distributed to department heads
  • Full script breakdown completed — every scene tagged for cast, extras, props, wardrobe, vehicles, animals, stunts, SFX
  • Scene numbers locked so every later document (schedule, call sheets, script supervisor logs) references the same numbers
  • Top sheet budget built from the breakdown, even if it's rough
  • Legal read for defamation, rights, and clearance issues (real locations, real brands, real people)

Phase 2: Budget and financing

  • Top sheet finalized into a detailed line-item budget, split above-the-line and below-the-line
  • Contingency reserve set aside (commonly 10% on indie budgets, more on anything with stunts, water, animals, or minors)
  • Financing closed or confirmed enough to start committing to deposits
  • Insurance quotes requested — general liability, equipment, and workers' comp at minimum
  • Payroll company or in-house payroll process decided

Phase 3: Key crew and department heads

  • Line producer or UPM hired first — they build the rest of the crew
  • 1st AD hired early enough to weigh in on the schedule, not just execute one someone else built
  • Department heads locked: DP, production designer, costume designer, sound mixer, gaffer, key grip
  • Each department head given breakdown access to start their own lists (camera package, art department buy/build list, wardrobe pulls)
  • Crew deal memos and rates confirmed before anyone shows up to a location scout

Phase 4: Scheduling

  • Stripboard built from the breakdown — see how to make a stripboard if this is your first one
  • Day Out of Days generated to confirm cast availability lines up with the shoot dates (what is Day Out of Days)
  • Page count per day sanity-checked against complexity — a dialogue scene in one room shoots faster than a night exterior with stunts, and how many pages per day is worth reading before you lock a schedule that looks fine on paper and falls apart on set
  • Day types assigned (day, night, split) with legal turnaround built in
  • Cover sets identified for every exterior-dependent day, per our guide on cover sets and weather contingency
  • One-liner schedule distributed to all departments once the board is locked

Phase 5: Locations

  • Scout list built from the breakdown's location needs
  • Tech scouts scheduled for every practical location with the full department head group
  • Location agreements signed, with insurance certificates delivered to property owners/managers
  • Parking, base camp, and holding areas confirmed for every shoot day, not just the "hero" locations
  • Permits filed with the local film office where required — timelines here can run weeks, so start early

Phase 6: Casting and crew logistics

  • Principal cast cast and contracted
  • Background/extras casting arranged if needed
  • Costume fittings scheduled ahead of the shoot, not the morning of
  • Travel and housing booked for any cast or crew coming from out of town
  • COVID/health protocols (if applicable) communicated to the full crew

Phase 7: Equipment and department prep

  • Camera package ordered — see what's actually in a camera package if you're speccing this for the first time
  • Grip and electric package ordered against the DP's and gaffer's lists
  • Sound package confirmed, including any wireless frequency coordination for locations with RF interference
  • Art department buy/build list finalized and shopping underway
  • Equipment truck or vehicle logistics arranged for load-in and moves between locations

Phase 8: The week before

  • Final call sheet dry run for day one — see how to make a call sheet for the format
  • Production office fully stocked (petty cash, first aid, walkies charged)
  • All contracts, releases, and COIs filed and accessible
  • Final crew and cast contact sheet distributed
  • Table read or rehearsal, if the schedule allows for one

This isn't a checklist you complete once and file away — department heads are pulling from their own sub-lists off of it the whole way through prep, and the schedule especially keeps shifting as locations confirm and cast availability gets locked. Production Slate exists mostly to keep those moving pieces — breakdown, budget, schedule, crew, equipment — in one place instead of six spreadsheets that stop agreeing with each other by week two.

Keep the whole prep period in one place

A pre-production checklist is only useful if the documents behind each line item stay in sync as things change. Our scheduling tools tie the stripboard, Day Out of Days, and call sheets to the same underlying data, so a cast date change or a location swap updates everywhere at once instead of needing six separate edits.

Written by Production Slate · Production Slate

Ready to ditch the spreadsheets?

Start on the Free plan — no credit card required.

Get started free

We use cookies for analytics to improve your experience. See our Privacy Policy.